Sign In | Join Free | My carsrow.com
carsrow.com
Products
Search by Category
Home > Electronic Measuring Instruments >

SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System

Categories AC Dynamometer
Brand Name: Seelong
Model Number: SSCH132-4000/15000
Certification: CMC, ISO9001, ISO45001, ISO14001, CE
Place of Origin: China
MOQ: 1 Set
Price: USD 25000-100000 dollars per set
Payment Terms: T/T
Supply Ability: 7 sets per month
Delivery Time: 6-8 working weeks
Packaging Details: Seaworthy Plywood
Certifications: CE, ISO 9001, ISO 45001, ISO 14001
Constant Torque Range: 0-4000rpm
Constant Power Range: 4000-15000rpm
Warranty: 1 year
Max Working Speed: 15000rpm
Rated Torque: 315Nm
Rated Power: 132kW
Measurement Range: 0-500Nm
Weight: 1200kg
Rated Voltage: 380V
Type: Electric Dynamometer
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System

SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System
1. SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System Components Description
NameSpecificationsAccuracy/Performance IndicatorsBrand
Electric dynamometerPower 132kW; rated speed 4000rpm; rated torque 315Nm (9550×132/4000); maximum speed 15000rpm;-Seelong
Torque flangeMeasuring range 0-500Nm ; signal output 4-20mA0.2% FS; repeatability error ≤ 0.1% FS; torque resolution 0.02NmHBM
Variable frequency inverter systemInput voltage: three-phase AC 380V±10%; frequency: 50-60Hz; overcurrent protection value: 1.5 times rated currentTorque control accuracy 0.2% FS; speed control accuracy ±1rpm; response time 5msABB
XLM-1000 measurement and control systemCommunication interface EtherCAT (≤1ms)/RS485;Speed measurement accuracy ±1r/min; measurement accuracy ±0.2% FS; torque control accuracy 0.2% FSSeelong
Data acquisition systemIncluding vibration acquisition unit, temperature acquisition unit, analog input acquisition unit, digital acquisition unit, etc.Seelong
Power analyzerVoltage 0-1000V; Current 0-500A; Harmonics 0-50th; Data update rate 10ms; Supports energy efficiency classification for medium-power motorsPower measurement accuracy ±0.05% FS; error ≤0.1%Seelong
Battery simulatorOutput voltage 200-800V; output current 0-400A; SOH 0-100% adjustable; supports industrial and commercial energy storage battery models (such as 200kWh lithium iron phosphate)Output ripple ≤0.5% FS; stability ±0.1%/hSeelong
CouplingsDiaphragm type; nominal torque 500Nm; permissible speed 18000rpm; diameter 60mm (suitable for medium-power motor shaft)-Seelong
Protective coverMaterial: Q235 steel plate; thickness 3mm; with safety interlock device (trigger response ≤ 0.1s)-Seelong
Cast iron plateMaterial: HT300; Specifications: 2000mm×1500mm×200mm; Tensile strength ≥300MPa; Surface anti-rust treatment-Seelong
Motor bracketAdjustment range (center height) 200mm-500mm; suitable for motors with diameters of 150-300mm (including medium-power special fixtures); concentricity ≤0.05mm-Seelong
2. 132KW New Energy Motor Dynamometer Technical Parameters
ParametersTechnical Indicators
Motor manufacturersSeelong
Rated power132kW
Rated torque315Nm
Rated speed4000rpm
Maximum speed15000rpm
Constant torque speed range0-4000rpm
Constant power speed range4000-15000rpm
Torque sensor modelHBM T40B
Torque sensor manufacturersHBM
Torque sensor range0-500Nm​​
Accuracy grade0.2%FS
3. SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System Advantages
1) Multi-environment adaptability: New plateau operating condition simulation and temperature difference warning functions have been added, covering high-altitude industrial scenarios (such as photovoltaic energy storage in western China) and high and low temperature workshops (such as auto parts factories).
2) Efficient testing process: Modular solution calling + automated report generation.
3) Sufficient safety redundancy: Automatic power-off function in case of fault, combined with 500Nm nominal torque coupling (suitable for 132KW motor with 315Nm rated torque, safety factor 1.58), customers have experienced zero safety accidents in the past three years.
4. SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System Applications
1) Medium-sized new energy vehicle drive motor: Suitable for 130-132KW new energy vehicle drive motors (such as mainstream mid-range SUV models), testing starting torque (≥300Nm) and high-speed energy efficiency (≥89%), meeting the needs of automobile companies' R&D and mass production quality inspection (one production line is equipped with 1-2 units, and the daily inspection volume is ≥25 units).
2) Industrial and commercial energy storage system motors: For 100-132kW energy storage converter drive motors and large energy storage fan motors, this system monitors temperature (≤80°C) and vibration (≤2g), simulating "charge and discharge cycle" operating conditions to ensure an annual operating failure rate of ≤0.8% for the energy storage system, in compliance with GB/T 36547-2018.
3) Medium-sized industrial motor testing: Suitable for 120-132kW air compressor motors and water pump motors, this test measures load efficiency (≥92% at 70% load) and reliability (stable operation at 60°C), helping industrial enterprises achieve energy-saving improvements (a single motor can save ≥8,000 kWh annually).
4) Medium-power motor R&D and quality inspection: Verify the performance of new medium-power permanent magnet synchronous motors (such as 132kW high-efficiency industrial motors) to ensure that mass-produced motors comply with GB/T 18488-2015 and IEC 60034-30-1 standards. Each test takes ≤30 minutes, increasing the R&D success rate by 25%.
5) Special vehicle motor testing: Suitable for 100-132kW drive motors of special vehicles (such as electric forklifts and sanitation vehicles), simulating "heavy-load starting" and "climbing" operating conditions to test the motor's overload resistance (120% rated torque for 5 minutes without failure), meeting the stringent usage requirements of special vehicles.
5. SSCH132-4000 /15000 132KW New Energy Motor Dynamometer Test Bench System Reference Standards
1) GB/T 18488.1-2015: Drive Motor Systems for Electric Vehicles Part 1: Technical Requirements (applicable to mid-range new energy vehicle motors)
2) GB/T 18488.2-2015: Drive motor systems for electric vehicles Part 2: Test methods
3) GB/T 1032-2012: Test methods for three-phase asynchronous motors (applicable to industrial medium-power motors)
4) GB/T 28046.3-2011: Environmental conditions and testing for electrical and electronic equipment of road vehicles Part 3: Mechanical loads
5) GB/T 36547-2018: Technical Requirements for Converters for Energy Storage Systems (Applicable to Industrial and Commercial Energy Storage Motors)
6) JJG 250-2005: "Torque Standard Machine Calibration Procedure"
7) DL/T 1028-2016: Verification Procedure for Power Quality Analyzers
8) IEC 60034-30-1: Rotating electrical machines-Part 30-1: Energy efficiency classes for single-speed, three-phase cage-type induction motors (EU medium-power motor certification)
9) JJG 623-2005: Verification Procedure for AC Electric Energy Meters
6. New Energy Motor Dynamometer Test Bench System Model List
ModelPower (KW)Torque (Nm)Rated Speed (rpm)Max Speed (rpm)Torque Measurement Accuracy
SSCH30-4500/1800030644500180000.2%FS
SSCH45-4500/1800045954500180000.2%FS
SSCH55-4500/17000551174500170000.2%FS
SSCH60-4000/15000601434000150000.2%FS
SSCH90-4000/15000902154000150000.2%FS
SSCH110-4000/150001102634000150000.2%FS
SSCH132-4000/150001323154000150000.2%FS
SSCH160-4000/150001603824000150000.2%FS
SSCH200-4000/120002004774000120000.2%FS
SSCH250-4000/120002505974000120000.2%FS
SSCH300-4000/100003007164000100000.2%FS
SSCH350-4000/100003508364000100000.2%FS
SSCH400-4000/100004009554000100000.2%FS
Can be customized
7. Delivery and After-sales Service
•Delivery: Standard models ship within 55 days (production cycle for medium-power equipment is shorter than 160kW); customized models ship within 55-110 days (including international logistics and customs clearance assistance, and a customs declaration list specifically for medium-power equipment). A "modular installation kit" is also available (with pre-connected core lines, reducing on-site installation time to 2 days).
•After-sales service: Core components (dynamometer, torque flange) are guaranteed for one year, and we provide lifetime bilingual technical support in both Chinese and English (response time ≤ 4 hours). Spare parts are shipped domestically within 24 hours and delivered internationally within 7 days. We also provide free 1.5-day operator training (including a special tutorial on medium-power motor testing), and support remote debugging (on a computer, including guidance on modular solution configuration).

8. FAQ


Q: What's the minimum order quantity for our cooperation?

A: We support small trail order of 1 pcs for stock products.

Q:How can I learn more about the products?

A: Please leave your email and we will send you your electronic sample book.

Q: What's your payment term?

A: Normally 40% T/T deposit, pay in full before shipment.

Q:What's the lead time for my orders?

A: Dynamometers production cycle is 6-8 weeks, sensors production cycle is 2-3 weeks, other products please contact with us.

Q: How do we get the overall solution of the test bench?

A: Leave us your email, our technical staff will communicate with you about the detailed plan.

Q: Can I come to visit your factory?

A: Sure, you are always welcomed to have a visit.


Quality SSCH132-4000/15000 132KW New Energy Motor Dynamometer Test Bench System for sale
Send your message to this supplier
 
*From:
*To: Seelong Intelligent Technology(Luoyang)Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0