| Sign In | Join Free | My carsrow.com |
|
| Categories | Compact 200 bailey bridge |
|---|---|
| MOQ: | 1SET |
| Supply Ability: | 2600 Ton/Tons per Month |
| Certification: | ISO9001 |
| Price: | 1600USD |
| Place of Origin: | CHINA |
| Model Number: | 13655280991 |
| Delivery Time: | 15 working days after prepayment |
| Payment Terms: | T/T,L/C |
| Packaging Details: | NULL |
| Company Info. |
| Zhenjiang Shangrong Electromechanical Equipment Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact
100 panel bridge from their appearance. The difference is its
increased panel height to 2.134m. It employed the method of
alternating joints between Reinforcement Chords and the joints
between panels. This method can decrease inelastic deformation
caused by the oversized pinholes. Pre-arch method is used to
additionally cut down mid-span and vertical deflection to a larger
degree. Bolt-connected components use the orienting sleeve- fixing
method to increase accuracy of connections. Shear is created in
orienting sleeves and tension is developed in bolts, which increase
the usage life of the bolts and ensure the safety of panel bridges.
Wind resistant brace is made to be composite type and is connected
to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging
so as to prevent the whole bridge from side bending. After the
erection, there will be a pre-arched degree over the span of the
bridge. Besides it can be assembled into single-lane bridges. The
compact 200 panel bridge can also be assembled into double lane
bridge, hence it broadens its application range. It is suitable for
the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Span Construction-Load Table ---Extra Single Lane (W=4200mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SS |
60 | SS | SS | SSR |
70 | SS | SS | SSR |
80 | SS | SSR | SSR |
90 | SSR | SSR | SSR |
100 | SSR | SSR | SSR |
110 | SSR | SSR | DS |
120 | SSR | DS | DSR1 |
130 | DS | DSR1 | DSR2H |
140 | DSR1 | DSR2H | DSR3H |
150 | TSTSR2 | DSR2H | DSR4H |
160 | DSR2H | DSR2H | TSR2 |
170 | TSR2 | TSR2 | TSR3 |
180 | TSR2 | TSR3 | TSR3H |
190 | TSR3H | TSR3 | QSR4 |
200 | QSR4 | TSR3/QSR4 | QSR4 |
Span Construction-Load Table ---Double Lane (W=7350mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SSR |
60 | SS | SSR | SSR |
70 | SSR | SSR | DS |
80 | SSR | DS | DSR1 |
90 | SSRH | DSR1 | DSR2H |
100 | DSR1 | DSR2H | TSR2 |
110 | DSR1 | DSR2 | QS |
120 | TS | DSR2H | TSR2 |
130 | DSR2H | TSR2 | TSR3 |
140 | TSR2 | TSR3 | TSR3H |
150 | TSR3H | TSR3H | QSR4 |
160 | QSR4 | QSR4 | QSR4 |
170 | QSR4 | QSR4 | |
180 | QSR4 | ||
1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. 3.one ft =0.3048 m; | |||
Services Division specialises in the installation, refurbishment, maintenance and decommissioning of structural steelwork, providing a cradle-to-grave approach to the management of our customers’ steelwork assets.
The Division provides our customers with the onsite expertise and support to ensure effective delivery of major infrastructure projects, employing approved safety systems and specialist techniques to facilitate the safe and efficient erection and installation of steelwork.
Delivering a turnkey solution to all construction sites, we have a dedicated team able to provide management of complex projects and in emergency situations. The service is highly comprehensive and includes maintenance and repair of existing bridges and other steelwork assets, as well as the management (installation and removal) of all necessary temporary works to ensure sites are left in a safe state on completion of the project.
Backed up with the highest levels of health and safety performance, demonstrated through our industry-leading accident frequency rate and safety performance accreditations, our team of highly experienced site managers provide a wide range of services to new and existing road, rail, energy and infrastructure projects.
· Bridge Installation
· Structural Steelwork Installation
· Bridge Strengthening and Refurbishment, including Heat Straightening and Structural Refurbishment
· Steelwork Maintenance
· Temporary Works
· Surface Protective Treatment including Grit Blasting, Painting and Encapsulation
· Specialist Advice, including Site Estimating, Bridge Inspections and Emergency Incidents
|
|