| Sign In | Join Free | My carsrow.com |
|
| Categories | Hipot Tester |
|---|---|
| Test Object: | Circuit breaker / disconnector / switchgear contact resistance |
| Model Number: | MY-5204 |
| Printer: | Built-in thermal printer |
| Payment Terms: | L/C,D/A,D/P,T/T |
| Power Supply: | Built-in rechargeable battery + AC220V dual supply |
| Place of Origin: | China Mainland |
| Communication: | Bluetooth, RS232, USB |
| Carrying Case: | Black protective hard case |
| Price: | 1500USD |
| Packaging Details: | carton |
| Self-calibration: | Standard resistance |
| Warranty: | 2-year warranty, lifetime support |
| Supply Ability: | 100/Month |
| Display: | Touch screen, Chinese/English switch |
| MOQ: | 1 |
| Wiring Terminals: | I+ / V+ / V- / I- four-terminal |
| Application: | Substation preventive test, field test |
| Delivery Time: | 1 week |
| Test Current: | 400A (large test current) |
| Brand Name: | MINGYANG |
| Accessories: | Test line, ground wire, power cord, fuses, printing paper |
| Company Info. |
| Wuhan Mingyang Technology Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
400A Loop Resistance Tester Battery Operated with Touch Screen & Thermal Printer
Product Description
The reliable and effective connection between the grounding downconductor of the power equipment and the grounding network is the fundamental guarantee for the safe operation of the equipment. The grounding down-conductor is the connection part between the power equipment and the ground network. During the long-term operation of the power equipment, the connection may be affected by factors such as moisture, and the nodes may be corroded or even broken. The resistance of the connection point of the grounding grid increases, so that it cannot meet the requirements of the electric power regulations, so that the equipment has unsafe hidden dangers in operation, and in severe cases, the equipment will lose ground.
Product Alias
400A Loop Resistance Tester / 400A Contact Resistance Tester / Battery Powered Loop Resistance Tester / Portable Loop Resistance Tester / High Current Micro Ohmmeter
Features
1. The new power supply technology is adopted in the grounding down
lead conduction tester.
2. It has the characteristics of small size, light weight, large
output current, good repeatability, strong anti-interference
ability and protection function.
3. The whole machine is controlled by single chip microcomputer,
which has a high degree of automation.
4. The instrument has high precision and easy operation. The
maximum current is 10A
Product Parameters
Product Name | Ground Down Lead Continuity Tester | ||
Model Number | MY-5204 | ||
Measuring Range | 0.3A~10A | ||
Accuracy Class | 0.02 | ||
Operating Temperature | -10ºC~50ºC | Maximum Test Current | 10A |
0.3A | 100mΩ~50Ω | 1A | 30mΩ~15Ω |
3A | 10mΩ~5.0Ω | 5A | 5mΩ~2.0Ω |
10A | 1mΩ~0.6Ω | Resolution | 0.0001μΩ |
Application Scenarios

FAQ
Question 1: What kind of field test services can you provide for
power equipment?
Manufacturer: We provide full-set on-site testing, commissioning
and diagnostic services for high-voltage power equipment, covering
power transformers, high-voltage circuit breakers, current
transformers, voltage transformers, high voltage cables, arresters
and GIS switchgear. Our available test items include transformer
turns ratio, winding DC resistance, insulation resistance,
dielectric loss & capacitance, power frequency / AC/DC withstand
voltage, SFRA sweep frequency response analysis, OLTC on-load tap
changer test, circuit breaker dynamic characteristic test, contact
resistance test and partial discharge inspection. These field test
services are widely applied in substation hand-over acceptance
after new project construction, regular preventive maintenance of
in-service power equipment, and fault location & diagnosis when
equipment has abnormal alarm or hidden defects. Our professional
technical team can go to the substation site to complete all tests
on site.
Question 2: What pre-work should be prepared before on-site HV
test?
Manufacturer: First of all, the tested power equipment must be
completely de-energized, fully discharged for enough time and
reliably connected to the ground wire, which is the most critical
safety requirement. The customer needs to clean the test area,
reserve enough safe working space, remove dust, oil stain and oxide
on equipment terminals, and isolate the test zone with warning
barriers and safety signs to prevent unrelated personnel from
entering. Meanwhile, please prepare and provide equipment nameplate
parameters, historical test reports, previous maintenance records,
and on-site environment data including ambient temperature,
relative humidity, and surrounding strong electromagnetic
interference condition. Our engineers will rely on these materials
to formulate a targeted, safe and standardized field test plan
before we arrive at the site.
Question 3: Can your instruments work normally in strong
electromagnetic interference substation environment?
Manufacturer: Yes. All our high voltage test instruments adopt
mature EMC electromagnetic compatibility and anti-interference
design. Many testers use variable frequency and frequency offset
technology to separate the test signal from 50Hz power frequency
interference generated by surrounding live equipment, effectively
filtering interference noise. Even in substations with heavy
electromagnetic disturbance, the instrument can keep stable
sampling and accurate measurement. However, we still recommend
operators keep sufficient safety distance from live high voltage
equipment during testing, use shielded and low-noise test cables,
properly ground the instrument host, and avoid long parallel layout
of test wires and power cables. These operations can further reduce
signal disturbance and guarantee repeatable and reliable test data.
Question 4: Will the high voltage field test damage the power
equipment under normal operation?
Manufacturer: When the whole test is strictly implemented following
IEC, IEEE and domestic power industry standards together with our
official operation manual, the field high voltage withstand test
belongs to non-destructive inspection. Its core purpose is to
evaluate the insulation health status of power equipment, and
qualified equipment can pass the test without any damage. If the
tested equipment already has hidden insulation defects such as
insulation aging, tiny crack or internal damp, the test can detect
these potential risks. Our engineers will select the proper test
voltage value and holding time strictly according to the equipment
rated voltage, service age and operation condition. We will never
carry out over-voltage test to protect the power equipment.
Question 5: Can you supply test reports after field test service?
Manufacturer: Definitely yes. Once all on-site measurement and data
recording are finished, our technical engineers will organize and
check all raw test data, waveform curves, screenshots and field
records one by one. We will make a formal and complete test report,
including basic equipment information, test environment parameters,
test items, original measured data, historical data comparison,
result analysis and professional evaluation & maintenance
suggestions. The final report can be exported as PDF electronic
file, and we also support on-site printing of paper copies. The
report can be directly used for project handover acceptance, power
department file archiving, and long-term tracking of equipment
performance trend in future maintenance cycles.
Question 6: If we place an order, how do you typically ship the
goods? Will there be any issues with transporting bulky items such
as reactors?
Manufacturer: We default to using dedicated logistics lines or
brand-specific express shipping services; small-sized main units
and accessories may also be shipped via standard courier services.
Large items, such as reactors and excitation transformers, are
packed using wooden crates or wooden frames for reinforcement to
prevent bumps and moisture exposure during transit; a packing list
is included with each package to facilitate item-by-item counting
for you. Logistics costs are typically determined by both parties
in accordance with the contract terms; after shipment, we will send
you both the tracking number and the carrier's contact phone number
for easy tracking.If your project site is remote or if delivery to
the site is required with a specified logistics company, please
inform us in advance when placing your order; we can then
coordinate and arrange accordingly.
Question 7: Our project is under tight deadlines; how long will it
take for the order to be shipped after we place it? Can we request
expedited shipping?
Manufacturer: Standard specifications – stock available; typically
delivered upon receipt of the order. Orders can be shipped within
[X] working days; for non-standard products requiring customized
voltage levels, capacities, or reactor combination configurations,
the production cycle typically ranges from [X] to [Y] days.The
delivery time will be approximately 7-15 working days; the specific
timeline shall be subject to the sales confirmation provided upon
order placement. If your project has a tight schedule, please
inform us of the latest expected delivery date before placing your
order; we will first verify the production schedule and inventory
status, and where possible, will coordinate expedited production
and prioritize shipment. However, it is recommended to allocate
sufficient transit time for logistics to avoid delaying on-site
testing.
Question 8: What is the warranty period for this equipment? If any
issues arise during on-site use, how will your after-sales service
respond?
Manufacturer: We provide a two-year free warranty on the entire
unit and lifelong technical support services. During the warranty
period, if issues arise due to defects in the equipment itself, we
will provide free repair or replacement of components; when
problems occur on-site, we commit to responding within 24 hours;
most wiring and parameter configuration issues can be resolved
through remote guidance via video or telephone; for cases where an
on-site visit is necessary, we will arrange for our technicians to
arrive at the location to resolve the issue. After the warranty
period expires, we still offer repair services, with spare parts
supplied at cost price for the long term, and software updates
provided free of charge for life. Upon delivery of the equipment,
we also offer free operational training (video operation guides)to
ensure that your testing personnel can operate the equipment
independently and proficiently; should you have any further
questions, please feel free to contact our dedicated after-sales
hotline directly.
Question 9: Our projects are distributed across several states, and
our procurement volumes are substantial; are the shipping methods
consistent across all states? How is the delivery time calculated?
Manufacturer: The specifications are identical; however, it should
be specifically noted that this equipment set is large in size and
heavy in weight—components such as the reactor and excitation
transformer are all classified as heavy components. Therefore,
regardless of which state or region the shipment is destined for,
we will uniformly utilize sea freight transportation. The packaging
employs export-grade wooden crates with reinforced structures,
along with moisture-proof and rust-proof treatments; the design of
these wooden crates is optimized for long-distance sea transport
and multiple lifting and transshipment operations. Upon arrival at
the destination, simply unpack the goods and conduct an inspection
before putting them into use. Regarding delivery time, the sea
freight transit period depends on the port of destination: near-sea
routes are generally faster, whereas ocean routes may take longer;
the exact number of days will be confirmed based on the shipping
schedule specified in the bill of lading. We have a dedicated
freight forwarding agency to handle booking of shipping space,
customs declaration, insurance, and other related procedures; once
the vessel departs, we will send you documents such as the bill of
lading and the packing list, enabling you to arrange for the
receipt of goods at the port of destination and their inland
transshipment in advance
Shipping scenario
Scene (One)

Scene (Two)

Attachment Directory
Serial Number | Name | Amount |
1 | Mainframe | one |
2 | Test line (high current line 6m*2, two high current test clps,
Voltage test line 6m*2) | one |
3 | Ground lead | one |
4 | 8A Fuse | three |
5 | Accessory package | one |
6 | AC 220V Power line | one |
7 | Printing paper | four |
8 | Disk | one |
9 | Specification | one |
10 | Inspection Report | one |
11 | Certification | one |
Attachment Image
|