Sign In | Join Free | My carsrow.com
carsrow.com
Products
Search by Category
Home > Sports Gloves >

ASTM BS GB Triple Bailey Truss Bridge Compact Panel Bridge ISO9001

Categories Panel Bridge
Brand Name: Zhonghai Bailey Bridge
Model Number: CB200/CB321
Certification: IS09001, CE
Place of Origin: China
MOQ: 1 Pcs
Price: USD 95-450
Payment Terms: L/C,D/P,T/T
Supply Ability: 60000ton/year
Delivery Time: 8-10 work days
Packaging Details: Naked
Type: Truss bridge
Application: Bailey Bridge
Surface: Galvanized
Name: Bailey Bridge
Standard: ASTM, BS, GB
Lane: Single lane 3.15m~4.2m,Double Lane 7.35m
Surface Finish: Pained or Galvanized
Secondary Steel: GB Q235
Net Width: 3.15m,3.6m,4.2m,7.35m,10.5m
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

ASTM BS GB Triple Bailey Truss Bridge Compact Panel Bridge ISO9001

Triple Trusses Bailey Bridges/compact Panel Bridge


After a heavy rainstorm, Bailey bridges need to undergo a series of special inspections to ensure their safety and stability. The following are the inspection items that need to be focused on:


1. **Foundation inspection**
- **Inspect foundation settlement**: Heavy rain may cause uneven settlement of the foundation, especially the piers and abutments. Check whether the foundation has obvious sinking or tilting.
- **Inspect foundation stability**: Check whether there is water accumulation or hollowing caused by scouring around the foundation, and ensure that the foundation is firmly connected to the surrounding soil or structure.


2. **Bridge deck inspection**
- **Inspect bridge deck cracks**: Heavy rain may cause bridge decks to crack or deform, and the bridge decks need to be carefully inspected for new cracks, warping or displacement. If damaged, they should be replaced if necessary.
- **Inspect bridge deck drainage**: Ensure that the bridge deck drainage system is unobstructed to prevent water accumulation from further eroding the bridge deck.


3. **Structural inspection**
- **Inspect connectors**: Check whether the Bailey plate's connecting pins, bolts, beam clamps and other connectors are loose, detached or damaged. If it is loose, tighten or replace it in time.
- **Check the overall structural deformation**: Observe the overall shape of the bridge and check whether there is obvious deformation, twisting or tilting.
- **Check the wind-resistant tie rod**: Make sure the wind-resistant tie rod is firmly installed and not loose or damaged.


4. **Safety facility inspection**
- **Check the warning signs**: Check whether the warning signs at both ends of the bridge and on the bridge are complete and clear. If they are detached or damaged, they should be replenished and repaired in time.
- **Check the guardrail**: Check whether the guardrail is firm, whether it is damaged or deformed, and ensure that it can effectively prevent people and vehicles from falling.


5. **Drainage system inspection**
- **Check the drainage channel**: After the heavy rain, it is necessary to check whether the bridge deck drainage channel is unobstructed, clear the blockage in time, and prevent the accumulated water from further eroding the bridge foundation and structure.


6. **Other inspections**
- **Check the bridge deflection**: Use professional equipment to measure the mid-span deflection of the bridge to see if it has increased. Increased deflection may indicate that there are certain problems with the bridge structure, and further analysis of the cause and corresponding measures are needed.
- **Check the rust condition**: Heavy rain may cause the metal parts of the bridge to rust, which needs to be checked and anti-rust treatment is carried out in time.

Through the above inspections, the impact of heavy rain on Bailey bridges can be fully evaluated, potential safety hazards can be discovered and dealt with in time, and the safe use of the bridge can be ensured.




Specifications:

CB200 Truss Press Limited Table
NO.Internal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSQSSSRDSRTSRQSR
200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
202High Bending Truss Shear(kN)3486961044139234869610441392
203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
StructureGeometric Characteristics
Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
ssSS25.485437580174
SSR50.96108751160348
DSDS50.96108751160348
DSR176.44163121740522
DSR2101.92217502320696
TSTS76.44163121740522
TSR2127.4271852900870
TSR3152.88326253481044
QSQS101.92217502320696
QSR3178.36380594061218
QSR4203.84435004641392

​​

CB321(100) Truss Press Limited Table
No.Lnternal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No.Geometric CharacteristicsStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity




Quality ASTM BS GB Triple Bailey Truss Bridge Compact Panel Bridge ISO9001 for sale
Send your message to this supplier
 
*From:
*To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0