| Sign In | Join Free | My carsrow.com |
|
| Categories | PEB Steel Workshop |
|---|---|
| Brand Name: | KXD |
| Model Number: | KXD-SSW1662 |
| Certification: | ISO |
| Place of Origin: | Qingdao,China |
| MOQ: | 200 Square Meters (MOQ) |
| Price: | US$45.00-100.00 |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 10000ton/Month |
| Packaging Details: | Seaworthy Package for Steel Structure Workshop |
| Sustainability: | Eco-friendly |
| Material: | Steel |
| Installation: | Easy |
| Size: | Customizable |
| Warranty: | 30 Year Limited Warranty |
| Connection Form: | Welded Connection |
| Service: | Design,Production and delivery,Erection and commission |
| Company Info. |
| Qingdao KXD Steel Structure Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |

Solution for steel frame high-rise prefabricated workshop with
office
Application scenario :
A multifunctional space that integrates production, warehousing, and office functions, suitable for scenarios such as steel workshops, heavy industrial plants, logistics hubs, and large exhibition halls, especially for modern industrial projects that require high-rise layouts or integrated office functions.
Core advantages:
1. Structural performance
-Lightweight and high-strength: Using composite steel columns and
welded H-shaped steel frames, the self weight is only one-third of
traditional concrete structures, the bearing capacity is increased
by 20%, the seismic fortification intensity reaches 8 degrees, and
the design service life is 50 years.
-Large span flexible layout : The net span of a single span can
reach 30 meters, and the high-rise design (up to 10 floors) meets
the vertical space utilization needs. The workshop and office area
can be functionally divided through floor separation or area
division.
2. Green and environmentally friendly
-Zero construction waste: Prefabrication of components in
factories, on-site bolt assembly, reducing construction pollution
by 90%;
-Full cycle recyclability: The steel recycling rate exceeds 90%,
and accessories such as purlins and plates can be disassembled and
reused, in line with the concept of circular economy.
3. Cost and Efficiency
-Construction period compression : The on-site installation period
of prefabricated components has been shortened by 50% compared to
traditional processes. With modular construction, a workshop and
office complex with a total area of 20000 square meters can be
delivered within 6 months;
-Low comprehensive cost : The basic cost is reduced by 30% compared
to concrete structures, and the maintenance cost is saved by an
average of 20% per year in the later stage (anti-corrosion coating
is maintained every 10 years).
4. Function integration
-Office production integration: The ground floor is equipped with
workshops and storage areas, and the upper floor is equipped with
an office area or control room, with standard independent stairs,
elevator shafts, and soundproof floor slabs;
-Heavy equipment adaptation : It can carry 3-30 ton cranes (such as
bridge and gantry cranes) to meet the needs of heavy machinery
operations.



Customized services:
1. Office area design
-Configurable mezzanine floor slab (steel structure+cement fiber
board), equipped with meeting rooms, laboratories, employee rest
areas, etc;
-The office area is equipped with soundproof walls (filled with
rock wool), central air conditioning interfaces, and fire
protection systems, which meet the requirements of building codes.
2. Special environment adaptation
-High temperature workshop: Install ventilation ridges on the roof
and axial flow fans on the walls to achieve more than 20 air
exchanges per hour;
-In high humidity areas, hot-dip galvanized purlins and
moisture-proof vapor barriers are used, and the ground is treated
with diamond sand for wear resistance.
3. Intelligent upgrade
-Reserve intelligent device interfaces (such as industrial robot
tracks, IoT sensors) to support the installation of MES systems
(manufacturing execution systems) or energy management platforms in
the later stage.
Collaboration Process:
1. Requirement communication : Confirm core parameters such as
workshop size, office area proportion, and crane load;
2. Scheme design : Provide structural drawings, renderings, and BIM
models to clarify the construction period and cost budget;
3. Production and installation : The factory prefabrication cycle
is 45 days, on-site installation is 30 days, and the pre embedding
of mechanical and electrical pipelines is completed simultaneously;
4. After sales guarantee : Provides 5-year free maintenance and
lifelong structural safety testing services.
Conclusion: A steel frame high-rise prefabricated workshop with an office has reshaped the integrated space of "production+office" through industrial construction mode. With its efficient, flexible, and environmentally friendly characteristics, it has become an ideal choice for upgrading modern industrial buildings.

|