| Sign In | Join Free | My carsrow.com |
|
| Categories | CNC Machining Parts |
|---|---|
| Brand Name: | Zhufu |
| Model Number: | 14054 |
| Certification: | ISO9001, CFA,, CASC |
| Place of Origin: | CHINA-GUANGDONG |
| MOQ: | 100 Pieces |
| Price: | negotiable |
| Payment Terms: | T/T, L/C |
| Supply Ability: | 100pcs/day |
| Delivery Time: | 20-25 days |
| Packaging Details: | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
| Material: | Stainless Steel/Iron/copper |
| Key words: | wrench |
| Quality control: | GJB9001C-2017 |
| Tolerance: | ±0.01mm |
| Product Color: | Natural Steel Color |
| Delivery time: | 15 working days |
CNC machining parts Wrench tube 14054 Diameter 36 mm stainless steel 303 Ra 1.6 drawing needed
Parameters:
| product name | wrench |
| application | kitchen tap |
| diameter | D36 |
| tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
| raw material | die casting |
| surface | no burs,no deformation |
| length | 35mm |
| chamfering | C1 |
Our Advantages :
1. one- stop service
2. High quality guaranteed
3. Fast Response
Factory Strength
1. Strong and Advanced Equipment

2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors

Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
| Qty | 1-1000 | 1001-10000 | >10000 |
| Estimated time(days) | 10 | 20 | To be negotiated |
After-sale service
FAQ:
A: yes, we welcome sample order to test and check quality. Mixed sample also are acceptable.
A: MOQ of mass production is 100pcs, and 1pc for sample order.
A: We usually ship by sea. It usually takes 30 days to arrive. Airline shipping also optional.
A:
Firstly, we need to know your requirements or application, providing drawing will be best.
Secondly, we quote according to your demand.
Thirdly, customer places a sample order and confirm delivery date.
Fourthly, customer confirms samples and places deposit for bulk order.
Fifthly, we arrange mass production.
|