| Sign In | Join Free | My carsrow.com |
|
| Categories | Industrial Felt Fabric |
|---|---|
| Brand Name: | HT |
| Model Number: | HTSF |
| Certification: | ISO |
| Place of Origin: | CHINA |
| MOQ: | 500 square meter |
| Price: | Price accept negotiation |
| Payment Terms: | Western Union, MoneyGram, L/C, T/T |
| Supply Ability: | 500000 square meter/month |
| Delivery Time: | within 15 days |
| Packaging Details: | plastic bag+carton |
| Color: | White |
| Technology: | Needled punched |
| Material: | Nomex,Polyester |
| Material Feature: | Heat Resistant |
| Thickness: | 6mm,8mm,10mm |
| Width: | 1600mm-3600mm |
| Continual temperature: | 220℃ |
| Peaking temperature: | 280℃ |
| Company Info. |
| HUATAO LOVER LTD |
| View Contact Details |
| Product List |
Needle Punched White Color Machinery Textile Sanfor Felts For Shrinking Machine
DESCRIPTION
Fabrics shrinkage tube sleeve felt palmers for monfort machine are used in calender roller, material Made from polyester or aramid fibres, felt sleeve 8 mm-12mm thickness.
They have seamless construction to leave no imprints and are fleece-layered to give fabric a softer, fuller hand
SPECIFICATION
| Material | 100%polyester, nomex mix polyester |
| Thickness | 6-12mm |
| Density | 2000gr/㎡ - 4000gr/㎡ |
| Working temperature | 130°C - 220°C |
| Packing | PP Woven Bags With Water Proofing |
| Delivery time | 5-15 working days upon receipt of payment |
| Payment Terms | T/T |
APPLICATION
Needle felt for sanforizing are used on the following machines : Monforts, Morrison, Muzzi, Sperotto Rimar, Bisio, Cibitex, Mather & Platt, Farmer & Norton, Monti, Tepa, Swastik, Dhall, Swastik, Thakore, Yamuna, Ronson, I Kuang, Poong Kwang, etc.



Package&Delivery
Package: plastic bag+carton
Delivety: Express company & by air & by sea or as your demands
FAQ
1. How long it can be use?
Depend on your scale of production and your use custom.
2. The Sample is free?
Yes, if you need the samples, we will send it to you freely. but hope you pay the freight. thank you.
3.What is the lead time?
About 7 working days.
4.What is the packing?
By air & by sea or as your demands
|